0 tamper annunciation relay board mounting, 0 wire routing, 0 contact keri systems – Keri Systems KE-8 User Manual

Page 5: Ke-8 controller enclosure, Installation guide

Advertising
background image

KE-8 Controller Enclosure

Installation Guide

Page 5 of 5

P/N: 01515-001 Rev. C

4.0

Tamper Annunciation Relay Board Mounting

A Tamper Annunciation Relay Board is required to meet UL-294 requirements. Please refer to the Tamper Annunciation
installation document for wiring instructions.

Figure 4 - Tamper Relay Board Mounting

5.0

Wire Routing

Eighteen knockouts are included for your convenience around the perimeter of the enclosure. Use good wiring

practices when wiring Controllers and the Tamper Relay board. Ensure all wiring is done to national and local

electrical codes (NEC).

6.0

Contact Keri Systems

End of document.

Keri USA

Keri UK, Ireland, Europe

2305 Bering Drive

San Jose, CA 95131

Unit 17

Park Farm Industrial Estate

Ermine Street

Buntingford

Herts SG9 9AZ UK

Telephone: (800) 260-5265

(408) 435-8400

Telephone: + 44 (0) 1763 273 243

Fax: (408) 435-7163

Fax:+ 44 (0) 1763 274 106

Web: www.kerisys.com

Web:www.kerisystems.co.uk

E-mail: [email protected]

[email protected]

E-mail:[email protected]
[email protected]

Enclosure Body - TOP EDGE

Tamper Annunciation Board

Mounting Location

Advertising