0 controller installation, 1 do, Wiegand elevator control panel – Keri Systems LC-508 Wiegand Elevator Control User Manual

Page 5

Advertising
background image

Wiegand Elevator Control Panel

2305 Bering Drive

01942-001 Rev. D

San Jose, CA 95131 USA
(800) 260-5265 (408) 435-8400 FAX (408) 577-1792
Web: www.kerisys.com E-mail: [email protected]

Page 5 of 24

LC-502W/LC-508W

Quick S

tart Guide

4.0

Controller Installation

Sections 4.1 and 4.2 are quick lists of things to do and not to do when installing LC-502 and LC-
508 panels.

4.1

Do

Plan ahead to meet power and telephone requirements for your system (1 phone line for the host
computer and one for each master LC-500W in each network).

Mount controllers and the distribution amplifier (for LC-502W applications) in environmentally
suitable areas – they require protection from weather and from temperature/humidity extremes.

Mount the controller and the distribution amplifier (for LC-502W applications) at least 3 feet
away from the controller's power supply to prevent EMI radiated from the power supply from
affecting the controller.

Use the enclosure as a mounting template to mark drilling holes for permanent mounting.

Consider mounting requirements - central versus distributed.
-

Central mounting places all controllers in one location, running lengths of cables out to each
door to support readers, inputs and outputs.

-

Distributed mounting places each controller near the door it supports running short lengths
of cable out to each door, but running a long network communication cable.

Note the locations of the knockouts in the enclosures and remove the appropriate knockout for
the easiest cable routing into the controller.

Route all controllers in a network in a single, continuous daisy-chain.

Route cables in accessible areas for ease of maintenance.

Connect all controllers to a quality earth ground.

Add transient suppression across electric devices attached to a controller output.

Verify the controller's supply voltage is 12 VDC – long power line runs cause a drop in voltage
at the end of the run.

Verify proper operation of the host computer's COM port.

Advertising
This manual is related to the following products: