KERN & SOHN FFN 25K10IPM User Manual

Page 14

Advertising
background image

FFN-N-BA-e-1323

14

Level balance with foot screws until the air bubble of the
water balance is in the prescribed circle.


Pressure compensation screw:
[1]












On the lower side of the balance there is a pressure compensation screw [1]
which has to be opened for the weighing process. Fasten the screw before
cleaning the balance.

Mains connection

Battery compartment

Pressure compensation
screw

Advertising
This manual is related to the following products: