4 monitoring of test resources, 5 basic safety precautions, 2 personnel training – KERN & SOHN CXP Version 1.7 User Manual

Page 15: 6 transport and storage, 1 testing upon acceptance, 2 packaging

Advertising
background image

4.4 Monitoring of Test Resources

In the framework of quality assurance the measuring-related properties of the bal-
ance and, if applicable, the testing weight, must be checked regularly. The responsi-
ble user must define a suitable interval as well as type and scope of this test. Infor-
mation is available on KERN’s home page (www.kern-sohn.com with regard to the
monitoring of balance test substances and the test weights required for this. In
KERN’s accredited DKD calibration laboratory test weights and balances may be
calibrated (return to the national standard) fast and at moderate cost.

5 Basic Safety Precautions

5.1 Pay attention to the instructions in the Operation Manual

Carefully read this operation manual before setup and commissioning, even if you
are already familiar with KERN balances.

5.2 Personnel training

The appliance may only be operated and maintained by trained personnel.

6 Transport and storage

6.1 Testing upon acceptance

When receiving the appliance, please check packaging immediately, and the appli-
ance itself when unpacking for possible visible damage.

6.2 Packaging

Keep all parts of the original packaging in case you need to return the appliance.
Only use original packaging for returning.
Before sending, disconnect all connected cables and loose/movable parts.
Attach possibly existing transport safeguards. Secure all parts, e.g. weighing plate,
power unit etc., to prevent slipping and damage.

CXB/CXP-BA-e-1417

15

Advertising
This manual is related to the following products: