3 mounting instructions for using wall bracket, 3 mains supply, 4 battery operation – KERN & SOHN EOE User Manual
Page 19: Mounting instructions for using wall bracket, Mains supply, Battery operation
7.2.3 Mounting instructions for using wall bracket
7.3 Mains supply
Electric power supply is by means of the external mains supply circuit. The printed
voltage level must comply with the local voltage.
Only use original KERN mains supply circuits. The use of other makes is subject to
approval by Kern.
7.4 Battery Operation
Remove the battery cover underneath the display. Connect 6 x 1,5V round cells. Re-
insert the battery cover.
Battery conservation through automatic power-off 3 minutes after ending a weighing
operation.
When the battery power is used up the display will show “LO“. Press the OFF key
and change the batteries at once.
When the balance is not in use for a longer period of time remove batteries and keep
them separately. Leakage of battery liquid might damage the balance.
EOB/EOE/EOB/EOS/BOBP-BA-e-0823
19