5 monitoring of test resources, 5 basic safety precautions, 2 personnel training – KERN & SOHN KFD 1500V20LM User Manual

Page 7: 6 transport and storage, 1 testing upon acceptance, 2 packaging / return transport, Monitoring of test resources, Basic safety precautions, Personnel training, Transport and storage

Advertising
background image

4.5 Monitoring of Test Resources
In the framework of quality assurance the measuring-related properties of the
weighing system and, if applicable, the testing weight, must be checked regularly.
The responsible user must define a suitable interval as well as type and scope of this
test. Information is available on KERN’s home page (

www.kern-sohn.com

with regard

to the monitoring of weighing system test substances and the test weights required
for this. In KERN's accredited DKD calibration laboratory test weights and weighing
systems may be calibrated (return to the national standard) fast and at moderate
cost.

5 Basic Safety Precautions

5.1 Pay attention to the instructions in the Operation Manual

Carefully read this operation manual before setup and commissioning,
even if you are already familiar with KERN balances.

5.2 Personnel training
The appliance may only be operated and maintained by trained personnel.
The installation of a display unit must only be carried out by a well acquainted
specialist with the workings of weighing balances.

6 Transport and storage

6.1 Testing upon acceptance
When receiving the appliance, please check packaging immediately, and the
appliance itself when unpacking for possible visible damage.

6.2 Packaging / return transport

Ö

Keep all parts of the original packaging for a possibly

required return.

Ö

Only use original packaging for returning.

Ö

Prior to dispatch disconnect all cables and remove

loose/mobile parts.

Ö

Reattach possibly supplied transport securing devices.

Ö

Secure all parts against shifting and damage.


7

KFD

V20-IA-e-1110

Advertising
This manual is related to the following products: