6.2 Unpacking, Scope of delivery

CAUTION

+

Danger for the back!
The weighing bridge is relatively heavy. Always use a suitable
lifting device to lift it out of the packaging or to transport it to
the required installation site.

+

Do not step under the suspended load, risk of injury!

• Floor scale

• Weighing cell feet

• User manual

1. Remove outer packaging and packaging material.

2. Remove covers.

3. Assemble eye bolts

4. Lift the weighing bridge equally off the packaging material, see caution note.

Secure the weighing bridge that it cannot fall down when it is lifted.

5. Ensure that the contents of package is complete.