1000 mbtu/h, 1700 mbtu/h, Figure 1 – LAARS NeoTherm LC NTH (Sizes 1000-1700 MBTU/h) - Installation Manual User Manual

Page 2

Advertising
background image

pg 2 of 6

H2352500B

Customer Service and Product Support:

800.900.9276 • Fax 800.559.1583

Headquarters:

20

Industrial Way, Rochester, NH 03867 • 603.335.6300 • Fax 603.335.3355

1869 Sismet Road, Mississauga, Ontario, Canada L4W 1W8 • 905.238.0100 • Fax 905.366.0130

www.Laars.com

Litho in U.S.A. © Laars Heating Systems 1404 Document 7025B

• Mount the VAri-PriMe control box at the top

left corner of the control panel as shown in
Photo 1 and Figure 1. Pre-drilled holes mark
the mounting location.

Figure 1

• Connect the Blue wire anywhere on the

24V+ boiler Terminal Block (tB3).

• Connect the Yellow wire anywhere on the

24V Neutral boiler Terminal Block (tB4).

and

1000 MBTU/h

POwer COnneCtiOnS:

1700 MBTU/h

Pre-drilled

holes

Photo 2

Advertising