1000 mbtu/h, 1700 mbtu/h, Figure 1 – LAARS NeoTherm LC NTH (Sizes 1000-1700 MBTU/h) - Installation Manual User Manual
Page 2
Advertising
pg 2 of 6
H2352500B
Customer Service and Product Support:
800.900.9276 • Fax 800.559.1583
Headquarters:
20
Industrial Way, Rochester, NH 03867 • 603.335.6300 • Fax 603.335.3355
1869 Sismet Road, Mississauga, Ontario, Canada L4W 1W8 • 905.238.0100 • Fax 905.366.0130
www.Laars.com
Litho in U.S.A. © Laars Heating Systems 1404 Document 7025B
• Mount the VAri-PriMe control box at the top
left corner of the control panel as shown in
Photo 1 and Figure 1. Pre-drilled holes mark
the mounting location.
Figure 1
• Connect the Blue wire anywhere on the
24V+ boiler Terminal Block (tB3).
• Connect the Yellow wire anywhere on the
24V Neutral boiler Terminal Block (tB4).
and
1000 MBTU/h
POwer COnneCtiOnS:
1700 MBTU/h
Pre-drilled
holes
Photo 2
Advertising