LAARS EDN Series - Installation, Operation and Maintenance Instructions User Manual

Page 9

Advertising
background image

Endurance

Page 9

1.

Run gas supply line in accordance with all
applicable codes.

2.

Locate and install manual shutoff valves in
accordance with state and local requirements.

3.

Install drip leg, ground joint union and drip cap
to trap sediment and for test gauge access.

4.

Support all piping with proper hangers.

5.

All threaded joints should be coated with piping
compound resistant to the action of liquefied
petroleum gas.

6.

The boiler and its individual shutoff valve must
be disconnected from the gas supply piping
system during any pressure testing of that system
at test pressures in excess of ½ psig (3.5kPa).

7.

The boiler must be isolated from the gas supply
piping system by closing its individual manual
shutoff valve during any pressure testing of the
gas supply piping system at test pressures equal
to or less than ½ psig (3.5kPa)

8.

The boiler and its gas connection must be leak
tested before placing the boiler in operation.

9.

Purge all air from gas lines.

3.2 Domestic Water Piping (EBP only)

1.

Connect tempering (mixing) valve 12 “Hot” port
to hot water outlet from unit. This valve should

Figure 12. Domestic Water Piping.

Figure 13. Domestic Water Piping With Storage Tank.

be no higher than 120°F mixed delivery
temperature or as local codes dictate. LAARS
RECOMMENDS ANTI-SCALD TEMPERING
(MIXING) VALVES (see Figure 12).

2.

Connect gate or shutoff valve 13 to tempering
(mixing) valve 12 “MIX” port, and cold
water inlet.

3.

Install supplied flow restrictor 14 ahead of
tempering (mixing) valve tee.

4.

Connect pressure relief valve 1 (if required by
codes), maximum 150 PSI as close to the unit as
possible. No other valves or restrictions may be
installed between the Endurance and the relief
valve.

DO NOT USE A TEMPERATURE/PRESSURE
RELIEF VALVE AS THIS IS NOT A STORAGE
HOT WATER HEATER.

Note: Installations with water containing 10 or

more grains of hardness, must be installed with
appropriate water treatment.

Length
of Pipe

Capacity of Pipe

1/2"

3/4"

1"

1-1/4"

ft.

m

MBTU/h

kW

MBTU/h

kW

MBTU/h

kW

MBTU/h

kW

10

3

132

38.7

278

81.5

520

152.4

1050

307.7

20

6.1

92

27

190

55.7

350

102.6

730

213.9

30

9.1

73

21.4

152

44.5

285

83.5

590

172.9

40

12.2

63

18.5

130

38.1

245

71.8

500

146.5

50

15.2

115

33.7

215

63

440

128.9

75

22.9

93

27.2

175

51.3

360

105.5

100

30.5

79

23.1

150

44

305

89.4

150

45.7

64

18.8

120

35.2

250

73.3

Additional length to be added for each tee or bend

ft

m

ft

m

ft

m

ft

m

1.3

0.4

1.7

0.5

2.2

0.7

2.7

0.8

Table 3.

Advertising