Laars heating systems, 2k. top-to-rear vent collar conversion – LAARS Mighty Max HH (Sizes 320M - 1000M) - Installation, Operation and Maintenance Instructions User Manual

Page 12

Advertising
background image

Page 12

LAARS HEATING SYSTEMS

3.

Remove the vent collar/stack from the flue
collector. Do not damage the vent collar/stack
during removal.

4.

Remove the blank plate from the rear of the
jacket.

5.

Remove the blank plate from the rear section of
the flue collector. Be careful not to lose the
insulation attached to the plate.

6.

Apply high temperature sealant and install the
blank plate (previously removed from the rear
section of the flue collector) on top of the flue
collector.

7.

Install the blank plate (previously removed from
the rear of the boiler jacket) over the stack
opening on the top panel of the boiler.

Figure 9. Top-To-Rear Vent Collar.

Adapter Plate

Top Panel

Vent

Collar/Stack

Blank Plate

(Boiler

Jacket)

Blank Plate On

Flue Collector

Blank Plate On

Boiler Jacket

Top Panel

1. Removal of Blank Plate and Adapter

Plate From Boiler

3. Blank Plate Placement

Over Stack Top Opening

Blank Plate

(Flue

Collector)

Vent

Collar/Stack

2. Removal of Blank Plate From

Rear of Flue Collector

4. Connecting Vent Collar/Stack

to Flue Collector

The Mighty Max HH boiler is certified as a true

direct vent unit when installed according to the
instructions for horizontal venting and ducted
combustion air. This can be done even if the runs are
vertical.

2K. Top-to-Rear Vent Collar Conversion

The Mighty Max HH boiler is shipped with the

vent collar on top of the heater. Follow this procedure
to convert it for rear connection (see Figure 9).
1.

Remove the adapter plate from the top panel.

2.

On the boiler jacket, remove the top panel and
ease its lip from under the edge of the bonnet to
gain access to the flue collector.

Advertising