9 Completing the Installation

1. Start up the sprayer and test the sprayer’s functionality. The NORAC control panel does

not need to be powered on for the original boom function switches to operate. Unfold the
booms and raise/lower each boom and the main section.

Confirm that the cabling and hoses are agreeable to the entire range of motion.

2. If any functions do not work, review the hydraulic and electrical portions of this manual to

check for proper installation.

3. Turn on the power for the UC4.5 Control Panel using the switch on the side of its chassis.

4. The procedure for the installation of the UC4.5 Spray Height Control system is now

complete. Begin the AUTOMATIC SYSTEM SETUP procedure as described in the UC4.5

Spray Height Control Operator’s Manual (M01).

5. For optimal performance of the UC4.5 system, there should be very little play at the hitch

clevis. The addition of polymer washers can help tighten up this connection (Figure 24).

Figure 24: Hitch Point