8 electrical installation – NORAC UC4+BC+JD7A User Manual

Page 33

Advertising
background image

30

ROP

4.8 E

LECTRICAL

I

NSTALLATION

1. Install the UC4+ Control Panel (E01) in the

cab of the sprayer. Mount the panel where
it will be clearly visible and within easy reach
of the operator.

A good spot to mount the UC4+ control
panel is on the right hand side of the cab to
the Roll Over Protection Bar (ROP). Four

pilot holes for the screws provided need to
be drilled to facilitate the control panel
mounting.

If desired, a mounting bracket (part
#A53255) can be purchased from your local
John Deere dealer to allow the UC4+
control panel to be mounted to the existing
John Deere terminal mount. Another
option is to purchase an adapter for the
flexible panel mount that has a 3/8" NC
threaded stud on the end to bolt through
the existing JD mount. You can find these at
your local outdoor store as a RAM mount
part number RAM-B-236. (See

http://www.ram-mount.com/

)

Figure 38: Control Panel Mounting

Figure 39: JD Control Panel Mounting

ROP

Advertising