15

4.7 C

OMPLETING THE

F

ACTORY

I

NSTALL

1. Test the functionality of the original

manufacturer’s boom controls. The
NORAC Control Panel (E01) does not
need to be powered up for the original
switches to function. Unfold the booms
and raise/lower each boom and main
section. Confirm that the cabling/hoses
are agreeable to the entire range of
motion. If one or more of these
functions do not work, review the
hydraulic and electrical portions of this
manual to check for proper installation.

2. Unfold the booms and level to 90 cm (or

35 inch) nozzle height. At this point
ensure the UC4 sensors are reading from
an adequate and uniform target, such as
gravel or dirt, or concrete.

3. By using the “Quick Install” feature of

the UC4+ panel, the system may be
configured in preparation for the End-
User. However, a hydraulic “ReTune
procedure will be required for optimal
performance. This is required to tune
the UC4+ hydraulic parameters to those
of the End-User tractor hydraulic
system.

4. To perform the “Quick Install

procedure, select the OM1 or OM2
sprayer type. However, rather than
toggling “YES” to select the type, hold
the toggle switch towards “YES” (for
several seconds) until the word
SENSOR” appears on the UC4+
controller screen.

5. The UC4+ control panel will then

prompt the installer to “EXIT CAB
AND PUSH BOOM TIP DOWN TO
GROUND
”. When exiting the cab and
approaching the boom, avoid walking
near the sensors as this may result in
measurement error.

6. At this point the UC4 panel should

display the Main Operating Screen:

M 90 M

(example)

7. This indicates the system is ready for the

second stage of installation. This will be
carried by the end user (for the reasons
as described previously in Step 3).