NORAC UC4+BC+NT4 User Manual

Page 27

Advertising
background image

23

Figure 26: Valve Cable Connections

16. Disconnect the four metri-pack

connectors for the boom tilt cylinders
from the Nitro valve block and connect
them to their respective connectors on
cable C15. Use Table 6 to match the
connectors together.

Table 6: Boom Tilt Functions

Sprayer

Connector

Function

NORAC

Connection

BM17

Left Boom UP

S2A

BM16

Left Boom DOWN

S2B

BM 15

Right Boom UP

S2C

BM14

Right Boom DOWN

S2D

Each metri-pack connector on

C15 is marked with its function.

17. Connect the Roll Sensor Cable (C02B)

to the 4 pin AMP plug on C15.

18. Route the free end of the Roll Sensor

cable (C02B) to the boom frame roll
sensor (E03).

19. Connect the other free end of cable

C02B to the extension cable C06.

20. Route cable C06 to the chassis roll

sensor

21. Connect the sensor branch cable (C02)

to the free connector on cable C02B.

22. Route the sensor branch cable (C02) to

the wing and main sensors. Follow
existing cables and/or hydraulic lines
along the boom.

23. Cable-tie the installed cables every 12

inches.

Provide enough slack in all cables

to account for the movement of
the main section, parallel lift, and
FOLDING boom movement.

24. Screw the cover plates (B17 and B18)

onto the access plate (B16) to seal the
cab.

Advertising