3 input module – NORAC UC5-BC-HD03 User Manual

Page 27

Advertising
background image



24

8.3 Input Module

1. Install the input module (E03) on the boom near the Hardi valve block. Secure it to the

boom using cable ties or optional brackets

2. Connect the free end of the CANbus cable (C02) from the valve module to the input

module.

3. Insert the 12 pin plug (P02) into the OEM 3 connector on the end of the input module.

4. Connect the 12 pin connector on the tilt interface cable (C20) to the Thru 2 connector on

the side of the input module.

5. Insert the connectors on the other end of C20 into the tilt connectors on the Hardi

solenoids

Figure 23: Input Module Connections

6. Connect the 12 pin connector on the main lift interface cable (C21) to the Thru 1

connector on the side of the input module.

7. Route cable C21 under the sprayer, to the main lift valve.

8. Insert the connectors on the other end of C21 into the main lift connectors on the Hardi

solenoids.

9. If the sprayer is equipped with a bypass valve, insert the connector labeled “Aux 1” into the

bypass valve connectors. If the sprayer does not have a bypass valve, connect the male and
female “Aux 1” connectors together.

Advertising