5 hydraulic plumbing: double acting – NORAC UC5-BC-HD03 User Manual

Page 33

Advertising
background image



30

10.5 Hydraulic Plumbing: Double Acting

1. After the NORAC valve is mounted, the hydraulic hoses and fittings can be plumbed. The

plumbing for the hydraulic circuit is shown schematically in Figure 4.

2. Install the 90 degree fittings on hoses HD06 onto the “A” ports on the NORAC valve

block.

3. Install the 90 degree fittings on hoses HD07 onto the “B” ports on the NORAC valve

block.

4. Route the free ends of the hoses to each of the wing tilt cylinders.

5. Remove the Hardi hoses from the “raise” line (the “B” line) of the cylinder and replace the

restricted straight BSPP fittings with the straight through fitting HD04.

6. Install the 1/4 inch BSP tee union (HD02) on the “raise” line of the cylinder and install the

NORAC and Hardi hoses onto the tee union.

7. Remove the Hardi hoses from the “lower” line (the “A” line) of the cylinder and install the

1/4 inch BSP tee union (HD02) onto the fitting on the cylinder.

8. Install the NORAC and Hardi hoses onto the tee union on the tilt cylinders.

9. At the Hardi main valve block, remove the hydraulic hoses that run from the “raise” line of

the tilt cylinders to the valve block (Figure 29).

10. Install the supplied restrictor (HD03) between the hoses and the valve block.

11. Remove the pressure and tank hoses from the Hardi valve block and insert the 1/4 inch BSP

tee union (HD02).

12. Connect hoses HD05 to each of the tee fittings and install the corresponding hose to the

pressure and tank port on the NORAC valve block.

Figure 29: Location of Hoses on Hardi Valve Block

Eagle Boom

Force Boom

Advertising