Figure 17: Valve Module Bracket Installation
Figure 18: Valve Module - Valve Coil Connections
5. Connect cable C04 one of the valve module CANbus connectors.
6. Route cable C05 from the other CANbus connector to the input module.
7. With the valve module securely mounted to the valve block, connect the 2-pin Deutsch
plugs labeled “VM” on the valve cable (C10) to the corresponding valve module connectors.
8. Connect the 2-pin Deutsch plugs labeled “SOL 1”, “SOL 2”, “SOL 3” and “SOL 4” on C10
to the NORAC valve block connectors.
9. Connect the 2-pin Deutsch plug labeled “SOL 5” on C10 to the Hagie Main Up connector.
Tank Port
Pressure Port
Sense Port
Left Tilt Ports
Right Tilt Ports