NORAC UC5-BC-HG07 User Manual

Page 22

Advertising
background image



19

Figure 17: Valve Module Bracket Installation

Figure 18: Valve Module - Valve Coil Connections

5. Connect cable C04 one of the valve module CANbus connectors.

6. Route cable C05 from the other CANbus connector to the input module.

7. With the valve module securely mounted to the valve block, connect the 2-pin Deutsch

plugs labeled “VM” on the valve cable (C10) to the corresponding valve module connectors.

8. Connect the 2-pin Deutsch plugs labeled “SOL 1”, “SOL 2”, “SOL 3” and “SOL 4” on C10

to the NORAC valve block connectors.

9. Connect the 2-pin Deutsch plug labeled “SOL 5” on C10 to the Hagie Main Up connector.

Tank Port

Pressure Port

Sense Port

Left Tilt Ports

Right Tilt Ports

Advertising