Installation instructions, Step 2: baseboard wiring, Step 1: mount heater to wall – Cadet 8F2000 User Manual

Page 3

Advertising
background image

NOTE: You do not need to disassemble any additional parts to mount
the heater.

6. Connect the grounding lead to the grounding pigtail (copper wire)

with a connector. It may be necessary to move ground lead to the
side you are wiring.

Installation Instructions

WIRING
COMPARTMENT COVER

MOUNT

SECURELY

TO WALL

Figure 7

Model

8F2025

Only

SUPPLY

WIRES

GROUND

WIRE

GROUNDING PIGTAIL

WIRE CONNECTOR

B

A

GROUND

DO NOT DISCONNECT

Figure 6

B

A

GROUND

DO ISCONNECT

STEP 2: Baseboard Wiring

1. Verify the electrical supply wires are the same voltage as the

heater. Check heater specifications to ensure correct wiring.
Failure to do so may destroy the heater and void your warranty.

Both 120 volt and 240 volt baseboard wiring utilize 3 supply wires.

120 volt baseboard wiring: 1 hot, 1 neutral and 1 ground.
240 volt baseboard wiring: 2 hot and 1 ground. No neutral needed.

For all baseboard wiring applications, both supply wires must be
connected to at least one (1) heater wire.

2. Disconnect one factory connector (See Figure 6. Model 8F2025 see

Figure 7). If wiring on the left side, disconnect factory connector
A. If wiring on the right side, disconnect factory connector B.

NOTE: There are no loose wires provided with the baseboard.
This is due to the ability to wire the baseboard on either the right
or left side of the heater.

3. Proceed to the next step.

STEP 1: Mount Heater to Wall

1. Locate wall studs closest to supply wires and position heater

(See Figure 1). NOTE: Wire connection is possible from either right
or left side of the baseboard heater.

4. Pull supply wires through the connector and secure leaving 6 inch

wire leads for later use (See Figure 4).

5. Mount the heater securely to the wall with nails or screws going

into at least two wall studs (See Figure 5). The back of the heater
has “star punch” dimples that allow nails or screws to easily pierce
the sheet metal.

STUDS

SUPPLY

STUDS

FLOOR

FINISHED

WALL

2. Remove the wiring compartment cover by removing the screw

(See Figure 2). The wiring compartment is an approved junction
box for the baseboard only. No additional junction box is required.

3. Remove the slotted knockout closest to the sup ply wires and install

a strain relief connector (See Figure 3).

JUNCTION BOX

WIRING
COMPARTMENT
COVER

Figure 1

Figure 2

Figure 3

Figure 4

Figure 5

DO NOT DISCONNECT

GROUND

DO NOT DISCONNECT

GROUND

Advertising
This manual is related to the following products: