Installing the nb20e or nb25e bridge, 1 unpacking the nb20e or nb25e bridge, 2 installing the bridge – Cabletron Systems NB20E User Manual

Page 21: Chapter 3, Unpacking the nb20e or nb25e bridge -1, Installing the bridge -1

Advertising
background image

3-1

CHAPTER 3

INSTALLING THE NB20E OR NB25E BRIDGE

This section contains instructions for installing Cabletron Systems'
NB20E or NB25E Two Port Ethernet Bridge, and for preparing the bridge
for operation. Verify that all network design guidelines and site
requirements listed in Chapter 2,

Installation Requirements/

Specifications

,

are met before installing the bridge.

3.1

UNPACKING THE NB20E OR NB25E BRIDGE

Before you install the NB20E or NB25E Bridge, you should visually
inspect the bridge and check the contents of the accessory package. To
unpack the bridge and accessory package:

1. Carefully remove the bridge from the shipping box. Save the shipping

box and materials in the event the unit has to be reshipped.

2. Slide the two foam end caps off of the bridge and remove the bridge

from its protective plastic bag. Set the bridge aside to prevent the unit
from being damaged.

3. Remove the plastic bag containing the accessory package and check

that the bag contains the following items:

one 8 foot (2.44 m) power cord

one cable support bracket

two 8-32 x .375 inch screws

three 6 (15.24 cm) inch cable ties

rack mount brackets

Contact Cabletron Systems' Technical Support immediately if any
discrepancy in materials exists.

3.2

INSTALLING THE BRIDGE

After you have met all requirements listed in Chapter 2,

Installation

Requirements

, complete the installation instructions provided in this

section.

Advertising
This manual is related to the following products: