Form I-MAPSIII&IV, Page 10

5.4 Mounting on a

Roof Curb

MAPS

®

packaged heating/cooling systems have a curb cap base designed for use

with a full perimeter curb. When on a roof, either a manufacturer-designed roof curb, a

field-supplied roof curb, or other field-supplied support is required.

NOTE: A Reznor

®

roof curb is required with a vertical discharge and/or bottom return air to provide a

weatherproof installation.

A MAPS

®

III Cabinet D size system which has an optional horizontal discharge may be

set directly on a concrete slab or cross supports (See Paragraph 5.3 below).

5.2 Curb Cap Base

and Mounting

MUST be sealed

between curb cap

rail and roof curb.

Optional or

Field-Supplied

Roof Curb fits

under and inside

the curb cap.

Base of curb cap edge may be

set directly on a cement slab or

on perpendicular supports.

4-7/8”

(124mm)

Edge of curb cap extends

down over roof curb.

Cabinet W

all

Curb

Cap Rail

5.3 Mounting a

Horizontal

Discharge

System on

Cross Supports

(no roof curb) -

D Cabinet only

Prior to installation, be sure that the method of support is in agreement with all local

building codes and is suited to the climate. If considering an installation without a roof

curb in snow areas, the support under the system should be at least 12” (305mm)

higher than the roof surface.

IMPORTANT NOTE: If setting cross supports on the roof

surface and not decking, be sure to have sufficient tread material under the supports to

adequately spread the load and prevent “sinking” into the roofing material.
The field supplied, weather resistant, cross-support structure must be secure and

adequate for the weight of the system (Refer to weights in Paragraph 5.1). See width

dimensions in Paragraph 4.2.

Damper Access

Coil Access

Fan & Motor

Access

Control Access

Heat Access

Heat Access

FRONT VIEW

SIDE

VIEW

There MUST be no less than five cross supports. A cross support MUST be in the approximate

locations shown in the Side View. ALL cross supports MUST extend the full width of the unit as shown

in the Front View. Cross supports must be weather resistant and must be able to support the unit weight.

Supports should be a minimum height of 12” (305mm) in snow areas.

Horizontal

Discharge

Cross Supports

2

3

5

1

4

FIGURE 6 - Cross Support Requirements (no roof curb) - Cabinet D

Curbs available with the system are fully enclosed and insulated. Other characteristics

by cabinet size and option are listed below.

FIGURE 5 - Cross

Section View of Curb

Cap Base

5.0 Mounting

(cont'd)

*For cross-reference of

cabinet size to Model Size,

see Appendix, pages 71-72.

MAPS

®

Cabinet Size*

Roof Curb

Discharge

Option

Height

A, B, & C

Down with Duct

Connections in the

Curb

CJ31

14" (356mm)

A, B, & C w/Energy Recovery Module

CJ34

D

CJ3

16" (406mm)

A & B

Horizontal Duct

Connections in the

Curb (at the inlet air

side of the unit)

CJ50

32" (813mm)

C

CJ49

36" (914mm)

A & B w/Energy Recovery Module

CJ54

32" (813mm)

C with Energy Recovery Module

CJ53

36" (914mm)

D - horizontal discharge connection on unit (no return air)

CJ3

16" (406mm)