0 mounting (cont'd), Unit with energy recovery module, Roof curb weight – Reznor RECC Unit Installation Manual User Manual

Page 22

Advertising
background image

Form I-MAPSIII&IV, Page 22

FIGURE 10F - Install

the Curb End with

Duct Connections

(

3

Y'S

) and the

Energy Recovery

Section Duct Top

(

Z

)

Counter

Flashing

(by installer;

install after

curb assembly)

Insulation

2 x 4 Wood

Nailer

Cabinet

Cant Strip

(by installer)

Weld, bolt,

or lag screw

curb to deck

structure.

FIGURE 10G -

Curb Detail

FIGURE 10H - Dimensions (inches/mm)

Weights and Dimensions of Options CJ54 & CJ53 for MAPS

®

unit with Energy Recovery Module

Cabinet

R

S

T

U

V W

X

Y

A*

inches

15

2-5/16 34-13/16 38-5/8 18 32

133 136-3/4

mm

381

59

884

981 457 813 3378

3473

B*

inches

22-1/2 2-5/16 49-13/16 53-5/8 18 32

133 136-3/4

mm

572

59

1265

1362 457 813 3378

3473

C*

inches

28-1/4 2-5/8 61-5/16 65-1/8 22 36 167-7/8 171-5/8

mm

718

67

1557

1654 559 914 4264

4359

*See Model Size / Cabinet Size Cross

Reference, pages 71-72.

Cabinet

Size *

A

B

C

Opt CJ54 Opt CJ4 Opt CJ53

lbs

675

785

1087

kg

306

356

493

Roof Curb Weight

9. Complete field installation of the roof curb

a) Check the assembly for squareness. The curb must be adjusted so that the

diagonal measurements are equal within a tolerance of ±1/8” (±3mm).

b) Level the roof curb. To ensure a good weatherproof seal between the unit curb

cap and the roof curb, the roof curb must be leveled in both directions with no

twist end to end. Shim as required and secure curb to roof deck.

c) Install field-supplied flashing (FIGURE 10G).

d) Apply 1/4" x 1-1/4" foam sealant tape to both the top surface of the curb rails

and the top surface of the perimeter of the duct dividers, being sure to make

good butt joints at all corners.

10. Lift the MAPS

®

unit on to the prepared curb (See Rigging and Lifting, Paragraph

5.5).

IMPORTANT: Verify that the unit will be placed in the correct airflow

orientation to mate properly with the discharge and return air openings.

Remember that the energy recovery module is at the discharge end of the curb.

11. After the MAPS

®

unit is in place, follow the instructions shipped with the energy

recovery module (Form I-MAPSIII&IV-ER) to lift and mate the energy recovery

module to the MAPS

®

unit.

5.0 Mounting

(cont'd)

5.4.2.2 Roof Curbs for Horizontal Airflow (Options CJ54 & CJ53) for

Cabinets A, B, and C WITH an Energy Recovery Module (cont'd)

5.4.2 Roof Curbs for Horizontal Airflow - Cabinets A, B, C (cont'd)

Y

Z

(Return

Air

Cap)

A

B

B

C

G1

G2

M

B

G2

M

N

G1

R

U

U

W

S

S

R

X

3/4” Hex Head Cap Screws with

Lockwashers and Hex Nuts (8 per corner)

2” Lag Screw and

Lockwasher (2 per corner)

Corner Hardware

for attaching “Y”:

F

(Insulation up)

3 Y’s

Supply

Duct

Supply

Duct

X

Y

Roof Curb Option CJ53 & CJ54

for MAPS with Option ER1

Energy Recovery Module

TOP VIEW

Roof Curb Option CJ53 & CJ54

for MAPS with Option ER1

Energy Recovery Module

SIDE VIEW

Return Air Duct

R

S

T

U

R

V

W

10-3/16

(259)

NOTE: Top duct liner is one piece

(illustrated) on Cabinet A. Cabinets B

and C have a two-piece top duct liner.

(MAPS Unit)

(Energy Recovery Unit)

NOTE: Cabinet Sizes B

and C - Insulated Duct

Top (Code Z) is two piece

ID

P/N by Cabinet Size

Y

A-261656 B-261657

C-261672

A-261386 B-261387

C-261414

A-261388 B-261389

C-261415

Z A-262545 B-262552

&262556

C-261676

&262435

Advertising