Power, ready led, Debug port led, Com1 port led – Solvline Eddy DK Ver 2.20 User Manual

Page 17: Com2 port led

Advertising
background image

Chapter

2. Getting Started

2.3.4.2.

Power, Ready LED

Ready LED: Indicates that the system is operating normally. (Normal: LED blinks)

Power LED: Indicates that the 5 V power is being supplied. (Supplying power: Red LED ON)

2.3.4.3.

Debug Port LED

Debug Port Transmit LED: Shows transmission status of the Debug Port.

Debug Port Receive LED: Shows reception status of the Debug Port.

2.3.4.4.

COM1 Port LED

COM1 Port Transmit LED: Shows transmission status of COM1 Port.

COM1 Port Receive LED: Shows reception status of COM1 Port.

2.3.4.5.

COM2 Port LED

COM2 Port Transmit LED: Shows transmission status of COM2.

COM2 Port Receive LED: Shows reception status of COM2 Port.

Debug Port LED, COM1 Port LED, COM2 Port LED is only supporting in Eddy-CPU and Eddy-DK-C

2-9

Advertising