Triner Scale AWB-5K User Manual

Page 7

Advertising
background image

Digital Indicator Connections

Connect & Test the Components

Before fully installing the scale, test the system to assure
that no damage occurred during shipping.

CONNECT THE COMPONENTS
1) Place all the components near to each other. Place the
weigh bars close together so that weight can be placed
on both bars at the same time.

2) Connect the AC adapter jack to the digital indicator,
then plug into a 110 VAC outlet.

3) Connect the weigh bar cables to the weigh bars.

4) Connect the weigh bar cables to the digital indicator.
The cables can be connected to either of the two sockets.

Digital Indicator

POWER UP THE SCALE
Press and hold the ON key located on the front of the
digital indicator.

NOTE
Keep the indicator plugged in to 110 VAC unless
operating with the battery. The indicator must be
plugged in to 110 VAC for 18+ hours to fully charge
the battery.

TEST THE SCALE
With the bars close together, stand on both bars and
confirm that the weight displayed is accurate.

Stand on each bar individually and confirm that the weight
displayed is accurate.

After testing, disconnect the system and proceed with
installation in the desired location.

AC Adapter Socket
with Cover Cap

RS-232 Port
- Optional Printer
- Optional PC Interface

Weigh Bar
Cable Sockets

USER’S GUIDE

Alley-Bar™
Livestock Weighing System

3

Advertising