VACUUBRAND MZ 4C User Manual

Page 23

Advertising
background image

Documents are only to be used and distributed completely and unchanged. It is strictly the users´ responsibility to check
carefully the validity of this document with respect to his product. Manual-no.: 997999 / 24/04/2008

page 23 of 28

➨ Tighten union nut first by hand and then tighten by one full

turn using open-ended wrench.

➨ Reconnect hose to the inlet of the condenser and tighten

union nut.

➨ Use open-ended wrench to reconnect hose to elbow fitting.

Assembling the pump at the pump support and on the base plate

(MD 4C + AK + EK / MD 4C + AK Synchro + EK)

➨ Assemble pump at pump support. Support pump appropriately.

➨ Screw in at each case two socket head screws at the rear and the front of the pump with hex key size 5.

Pay attention to washers.

➨ Position pump with pump support on the base plate and tighten the four hexagon nuts on the feet of the

pump support with an open-ended wrench w/f 10.

If the pump does not achieve the ultimate pressure:

☞ In case the diaphragms and valves have been replaced, a run-in period of several

hours is required before the pump achieves its ultimate vacuum.

If all pump heads achieve a vacuum below 120 mbar but pump does not achieve the
ultimate total pressure:
Check hose connectors between pump heads and manifolds for leaks. If necessary
recheck pump chamber. If necessary disassemble fittings again and screw in the el-
bow fittings another turn, use PTFE sealing bond as necessary.

Advertising
This manual is related to the following products: