General view basic setups, General view basic setups cvc 2, Ready to start – VACUUBRAND CVC 2II User Manual

Page 9

Advertising
background image

page 9 of 36

Documents are only to be used and distributed completely and unchanged. It is strictly the users´ responsibility to check
carefully the validity of this document with respect to his product. manual-no.: 997835 / 15/12/2009

setting pressure unit (mbar / Torr / hPa)

configuration of the cooling water valve if applicable

automatic identification of the solenoid operated isolation valve

setting basic setup

ready to

start

basic setup ”Standard”

(factory-set)

controller switches
-

solenoid operated isolation valve (indispensable)

-

cooling water valve (optional)

basic setup ”Management”*
controller switches
-

pump

-

solenoid operated isolation valve if connected

-

cooling water valve (optional)

basic setup ”VACUU•LAN”*
controller switches
-

pump according to preset pressure and time

values
-

solenoid operated isolation valve if connected

* only in combination with Vacuum-Management-
System VMS Module A

basic setup ”Management

Plus”*

controller switches
-

pump, but with after-running to pump out condensate

-

solenoid operated isolation valve (indispensable)

-

cooling water valve (optional)

General view basic setups

CVC 2

II

Advertising