Carrier 50HQ User Manual

Sing le-package water-source heat pumps

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Number One

AirConditbning

Maker

Carrier Parkway • Syracuse NY 13221

Sing le-Package

Water-Source Heat Pumps

INDEX

Page

SAFETY CONSIDERATIONS...........................1

INSTALLATION............................................... 1-5

Step 1 — Check Equipment and

Jobsite .............................................................. 1

• UNPACKAGE UNIT

• INSPECT EQUIPMENT
• COMPLETE OR CONSIDER THESE

SYSTEM REQUIREMENTS

Step 2 — Connect Supply Ductwork..............2
Step 3 — Make Piping Connections.............. 3

• CONNECT WATER SUPPLY AND

RETURN LINES

• INSTALL BALANCING VALVES

Page

MAKE CONDENSATE DRAIN
LINE CONNECTION

Step 4 — Make Electrical Connections... 4

• INSTALL A BRANCH CIRCUIT

DISCONNECT PER NEC

• BRING POWER LEADS INTO UNIT
• CONNECT GROUND LEAD TO

GROUND LUG IN SPLICE BOX

• SET FAN MOTOR SPEED
• CONNECT CONTROL POWER WIRING

START-UP......................................................... 6

SERVICE...................................................................7

#

SAFETY CONSIDERATIONS

Installation and servicing of air conditioning

equipment can be hazardous due to system pressure
and electrical components. Only trained and quali­
fied service personnel should install, repair or

service air conditioning equipment.

Untrained personnel can perform basic mainten­

ance functions of cleaning coils and cleaning and

replacing filters. All other operations should be

performed by trained service personnel. When
working on air conditioning equipment, observe

precautions in the literature, tags and labels
attached to the unit and other safety precautions
that may apply.

Follow all safety codes. Wear safety glasses and,

work gloves. Use quenching cloth for brazing
operations. Have fire extinguishers available for all

brazing operations.

WARNING:

Before

performing

service

or

maintenance operations on system, turn off
main power switch to indoor unit and outdoor

unit. Turn off accessory heater power switch if

applicable. Electrical shock could cause per­

sona! injury.

INSTALLATION

Step 1 — Check Equipment and Jobsite

UNPACKAGE UNIT — Move to final location.
Slide from carton taking special care not to damage

service valves or grilles.

INSPECT EQUIPMENT — File claim with ship­

ping company if shipment is damaged or incomplete.

COMPLETE OR CONSIDER THESE SYSTEM

REQUIREMENTS before installation:

a.

b.

c.

d.

e.

Consult local building codes and National Elec­
trical Code (NEC) for special installation

requirements.

Consider type of water source. Ensure there is an

adequate supply of water at temperature of 60 F
to 90 F with minimum pressure of 10 psig.

Provide sufficient space for water piping, con­

densate drain, wiring and servicing unit. See

Fig. 1. When front (external) water piping

connections are used, locate unit so piping does

not block front access panels. (Units installed in
confined areas may have to be removed for major

servicing such as compressor or fan motor
replacement.)

Provide a minimum 6-in. clearance between
return air filter and adjacent wall.

Mount unit on floor or solid platform so unit is

elevated. (The 50HQ units can be suspended
from ceiling. See “f’ below.) Make sure unit is

supported from the bottom. To reduce sound

transmission, especially when unit is located in a
closet or utility room having louvered doors, the
following acoustical treatment is recommended:

place an isolation pad under unit. Pad must be

same size as unit base. Construct a 1-in. fiberglass
sound shield in front of unit.

© Carrier Corporation 1981

Form 50HQ,VQ-1SI

Advertising