Pump rotor, continued), Specifications wiring diagrams – Sears 583.35683 User Manual

Page 14

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

(Pump Rotor, continued)

10.

Install blades, pump plate, air

filters, and filter end cover.

11.

Replace fan guard and upper shell.

12.

Adjust pump pressure (see page 11).

Note: If rotor is still binding, proceed

as follows:

13.

Perfonn steps 1 thru 6 (see page 13).

14.

Place fine grade sandpaper (600

grit) on flat surface. Sand rotor
lightly in “figure 8” motion four
times (see Figure 29).

15.

Reinstall insert and rotor.

16.

Perform steps 10 thru 12 above.

SPECIFICATIONS

WIRING

DIAGRAMS

Gap Adjusting Screw

Blade

I .0037.004" Gap

^ Measured With

Feeler Gauge

Sandpaper

Rotor

Gap Adjusting Screw

Figure 28 - Gap Adjusting Screw Locations

Figure 29 - Sanding Rotor

Output Rating (Btu/Hr.)
Fuel
Fuel Tank Capacity (U.S. Gal.)
Fuel Consumption (Gal. Per Hr.)
Electric Requirements
Amperage (Normal Run)
Hot Air Output (CFM)

35.000

55,000

110,000

Use Only Kerosene or No. 1 Fuel Oil
3.0

5.0

9.0

.26

.40

.82

120 V/60 Hz (Same All Models)

2.0

2.0

4.5

165

175

490

Power Plug

120V/60HZ

Reset

' Button

Figure 30 - Wiring Diagram, 35/55,000 Btu/Hr Modeis

Power Plug

120V/60HZ

Advertising
This manual is related to the following products: