OPERATION AND TYPICAL WIRING DIAGRAMS

When zone thermostat calls for heat, the appropriate
circulator is actuated and the isolated end switch X-X will
start the boiler.

system

circulator is actuated if it is installed.

JUMPER PLACEMENT

The jumper (factory installed) should be placed between
terminal ZC and ZR. Connect isolated end switch X-X to
T-T terminals on boiler control.

COLD START (LOW THERMAL MASS) BOILER
APPLICATION

OPERATION

When zone 1 thermostat calls for heat,

end switch X1-X1 is also energized. In additon, a

TANKLESS COIL (HIGH THERMAL MASS)
BOILER APPLICATION

OPERATION

When zone thermostat calls for heat, the appropriate
circulator is actuated and the boiler is started. If the
boiler temperature drops below the low limit, all
circulators will cease until the boiler temperature is
increased above the low limit.

JUMPER PLACEMENT

Remove the factory installed jumper between terminals
ZC and ZR.
Connect terminal ZC to ZC terminal on boiler (aquastat)
control.
Connect terminal ZR to ZR terminal on boiler (aquastat)
control.

ON

ZONE 1 PRIORITY

OFF

MASTER SLAVE

ZONE EXPANSION

OUTPUT

T1

T1 T2 T2 T3 T3 T4 T4 T5 T5 T6 T6

1

2 3 4

C

24

VAC

R W R W R W R W R W R W

THERMOSTATS

ZC ZR

N L

120 Vac

120 VOLT CIRCULATORS

SYS PMP ZONE 1 ZONE 2 ZONE 3 ZONE 4 ZONE 5 ZONE 6

N L N L N L N L N L N L N L

Factory Installed
Jumper

System

Circulator
(Optional)

Zone 2

Circulator

Zone 4

Circulator

Zone 6

Circulator

Zone 1

DHW

Circulator

Zone 3

Circulator

Zone 5

Circulator

120 VAC
(HOT)

(COM)

Boiler/
Burner
Control

T

T

THERMOSTATS

(eg. Azel Tech, D-135E)

AQUASTAT ON INDIRECT/

DOMESTIC HOT WATER

(DHW) HEATER

COM

R W

3 WIRE

THERMOSTAT

Honeywell

L8148

MANUAL

PRIORITY OVERRIDE

ON

OFF

Zone

2 3 4 5 6

X

X

X1 X1

ISOLATED

END SWITCH

ZONE 1

TIMER

TT on Boiler with

DHW TT Terminals

Boiler
Control

T

T

DHW

ON

ZONE 1 PRIORITY

OFF

MASTER SLAVE

ZONE EXPANSION

OUTPUT

T1

T1 T2 T2 T3 T3 T4 T4 T5 T5 T6 T6

1

2 3 4

C

24

VAC

R W R W R W R W R W R W

THERMOSTATS

ZC ZR

N L

120 Vac

120 VOLT CIRCULATORS

SYS PMP ZONE 1 ZONE 2 ZONE 3 ZONE 4 ZONE 5 ZONE 6

N L N L N L N L N L N L N L

Zone 2

Circulator

Zone 4

Circulator

Zone 6

Circulator

Zone 1

DHW

Circulator

Zone 3

Circulator

Zone 5

Circulator

THERMOSTATS

(eg. Azel Tech, D-135E)

COM

R W

3 WIRE

THERMOSTAT

MANUAL

PRIORITY OVERRIDE

ON

OFF

Zone

2 3 4 5 6

X

X

X1 X1

ISOLATED

END SWITCH

ZONE 1

TIMER

BURNER

ZC

ZR

C1

C2

1

B1

B2

2

Honeywell L8124A or C

Figure 2

Figure 3