Bonaire H2 Optimiser User Manual

Page 3

Advertising
background image

I

NSTALLATION

/

M

AINTENANCE

I

NSTRUCTIONS

H

2

Optimiser


Installation

The Integra unit comes with most of the H

2

Optimiser components already

installed.

The CARE-FREE Water Conditioner A/C 6 is installed in the water

distribution circuit.

The water outlet solenoid and overflow fitting have been installed and the

wiring loom is connected to the control board.

The water inlet valve loom has been connected to the control board.

Installation Requirements

Install the water inlet solenoid valve onto the ball float valve using the

90° elbow provided.

Connect the flexible connector to the inlet solenoid valve.

Connect the solenoid wiring loom to the inlet solenoid valve terminals.

Connect the flexible connector to the mains water.

Refer to the unit installation instructions for all other installation requirements.

H

2

Optimiser Operation

The H

2

Optimiser has 2 functional areas:

The water outlet solenoid is part of the water distribution circuit. Once the

hour counter setting has been met, the inlet valve will close and the water

outlet valve will open allowing the sump water to be pumped out of the unit

for a period of 3 minutes. The water outlet solenoid will then close, the

water inlet valve will open and normal operation will be resumed. If there

has been no activity of the unit for 30 days since last usage, the unit will

pump out the sump water upon unit reactivation

The CARE-FREE Water Conditioner A/C 6 generates its own current once

it has been fully submersed in the water reservoir.

Page 3

Advertising