Dunkirk D249 Series Commercial Boiler User Manual

Page 6

Advertising
background image

Boiler feed pump return additional parts See Table #5b.

See Figure #2 for installed locations of additional parts.

• Tappings B & B - Water gauge glass set and

pressuretrol (requires fittings 4-7 in Table #5b).

• Tapping D - Steam gauge and pressuretrol (requires

fitting 8 in Table #5b).

• Tappings E & F - LWCO (auto and manual) and

pump control. Installer supply and size the steam

(top) and water (bottom) equalizing pipe lengths so

the horizontal cast line on the control body is 28”

above floor. Secondary control is 24” above the floor.

See Figure #2.

Table #5b: CSD-1 Steam Trim Carton Material List For

Boiler Feed Pump Return

(Part No. 41257104)

Item

Description

Part No.

Qty.

1

Pressure Switch Control, Manual Reset

14662311

1

2

LWCO and Pump Control (primary)

14626306

1

3

LWCO, MAN RESET, CSD-1 APRVD, SHT PROBE

240007388

1

4

90° Brass Syphon, ¼”

14643004

1

5

Brass Nipple, ½” x 3½”

14607024

2

6

Brass Tee, ½” x ½” x ¼”

14693051

2

7

Brass Coupling, ½”

14693052

2

8

Bushing, ½” x ¼”

1060001

1

BOILER FEED PUMP RETURN

6

Advertising