Warning – EarthQuake 6065VEC User Manual

Page 12

Advertising
background image

OPERATOR INSTRUCTIONS ANd PARTS

CRT Models 5055C & 6065VEC

Page 12

GetEarthquake.com

800-345-6007

dEPTh REGULATOR LEvER

Tilling depth is controlled by the height of the depth regulator lever.
To adjust tilling depth. (SEE FIGURE 4)
1. Remove detent pin.
2. Raise the depth regulator lever to position tines at chosen tilling

depth.

3. Align hole in depth regulator lever with hole in depth regulator

bracket and replace detent pin.

Depth Regulator Lever Down = Shallower tilling. Place the

detent pin in the top hole of the depth regulator lever for shallowest

tilling.
Depth Regulator Lever Up = Deeper tilling. Place the detent pin

in the bottom hole of the depth regulator lever for deepest tilling.

BELT TENSION AdjUSTMENT

Proper belt tension is critical to good performance. After 1/2 hour of

operation, all cables may have to be adjusted due to initial stretch.

Thereafter, check tension after every 2 hours of operation.
To increase belt tension: (SEE FIGURE 5)
1. Loosen upper jam nut. Turn nut up cable in 1/8” increments.
2. Tighten lower jam nut.
3. Check adjustment.
This procedure can be repeated until conduit adjustment bolts are

fully adjusted. If no more adjustment can be made, belt may have to

be replaced.

dO NOT AdjUST TILLING dEPTh UNLESS dRIvE

SAFETY CONTROL LEvERS ARE RELEASEd TO

NEUTRAL POSITION.
ALWAYS SET ThE dEPTh REGULATOR LEvER IN

ThE TRANSPORT POSITION BEFORE STARTING

ENGINE, ThAT IS, PLACE ThE dETENT PIN IN

ThE hIGhEST hOLE OF ThE dEPTh REGULATOR

LEvER.

WARNING

!

reverse cable

forward cable

upper jam nut

lower jam nut

depth regulator

bracket

depth regulator lever

detent pin

FIGURE 4

FIGURE 5

Advertising
This manual is related to the following products: