5 handrails, Part 3 – execution, 1 examination – EZ-ACCESS PATHWA MODULAR ACCESS SYSTEM User Manual

Page 13: 2 assembly, 3 maintenance, 4 important note

Advertising
background image

Page | 13

A R C H I T E C T U R A L S P E C S

2.5 HANDRAILS

a. MATERIALS

1. Handrails shall be all aluminum construction from alloys 6061, 6063, or 6065.

b. DESIGN AND FABRICATION

1. Handrails shall be provided along both sides of ramp segments. The inside handrail

on turn platforms and dogleg ramps shall always be continuous. Gripping surfaces
shall be continuous, without interruption by newel posts, other construction elements,
or obstructions.

2. Handrails shall be 1½” diameter.
3. The top of the handrail gripping surface shall be mounted between 30” and 34”

above the ramp surface, and the top of the intermediate rail shall be mounted
between 18” and 22” above the ramp surface.

4. All handrail tubes shall be deburred and all sharp edges removed from gripping

surfaces.

5. All handrails shall be supplied with brushed, architectural finish (optional textured

powder coat finish available).

PART 3 – EXECUTION

3.1 EXAMINATION

a. Verify site conditions are ready to receive work of this section.

3.2 ASSEMBLY

a. Install prefabricated aluminum ramps according to manufacturer’s instructions and the

approved drawings without damage to shape or finish. Repair or replace any damaged
units.

b. Align and maintain uniform slope and horizontal joints as installation progresses.
c. Fasten units in place as indicated in shop drawings or plans.

d. Install railings according to manufacturer’s instructions and as shown on approved

drawings.

3.3 MAINTENANCE

a. Ramp system must be maintained in accordance with manufacturer’s instructions.

3.4 IMPORTANT NOTE

a. Specifications are subject to change without notice.

Advertising