Maintenance, Ab b – Glow-worm Ultracom2 35 Store User Manual

Page 46

Advertising
background image

0020112185_PROTO_13 - 01/11 - Glow-worm

- 44 -

18.2 Casing removing

18.2.1

front panel

A

B

A

2

1

Key

1 front panel retaining screw

2 front panel

• Undo the two screws (1) on the underside of the front panel

and remove the front panel (2).

18.2.2

Control box

230

V

230

V

A

A

B

B

1

Key

1 Control box

• Position the control box (1) into the service position.

18.3 Combustion check and setting the air/gas

ratio valve

18.3.1

Competency to carry out the check of

combustion performance

i

BS 6798: 2009 Specification for installation and

maintenance of gas-fired boilers of rated input not

exceeding 70kW net advises that:

- The person carrying out a combustion measurement must be

assessed as competent in the use of a flue gas analyser and

the interpretation of the results.

- The flue gas analyser used should be one meeting the

requirements of BS7927 or BS-EN50379-3 and be calibrated in

accordance with the analyser manufacturers’ requirements.

- Competence can be demonstrated by satisfactory completion

of the CPA1 ACS assessment, which covers the use of

electronic portable combustion gas analysers in accordance

with BS 7967, parts 1 to 4.

• Ensure that the gas analyser is set to the correct fuel

setting.

• Select the “ + ”, constant central heating with DHW

function by pressing the “

” button repeatedly, refer to

commissioning section. The boiler should fire automatically.

i

Safe combustion can only be verified by measuring

CO/CO

2

ratio. This must not exceed the value shown in

the table opposite.

18.3.2

Preliminaries

Prior to, during servicing and after any maintenance or changed

parts, the following must be checked.

• The integrity of the flue system and flue seals.

• The integrity of the appliance combustion circuit and relevant

seals.

• Electrical, gas and water connections.

• System pressure.

• The combustion performance, refer to the following procedure.

• The operational gas inlet pressure and gas rates, refer to the

commissioning section paragraph 12.5. Correct any falt before

continuing.

Combustion check and setting the air/gas ratio

• Remove the front casing panel, see diagram above and hinge

down the control box. Taking care not to touch any internal

components, proceed as follows:

• Connect the CO

2

combustion analyser to the relevant test

point, see diagram opposite.

MAINTENANCE

Advertising