Electrical requirements, Service line requirements, Space requirements – Labconco Protecto Stainless Steel Perchloric Acid Laboratory Fume Hoods 9682100 User Manual

Page 12: Your next step

Advertising
background image

8

Product Service 1-800-522-7658

Chapter 2: Prerequisites

Electrical Requirements

The Protector Perchloric Acid Hood models feature
internal wiring for the fluorescent light assembly and
light switch. All internal wiring is terminated at the
single point wiring junction box for connection by a
qualified electrician. The blower switch, and light
switch wires are also terminated at the single point
wiring junction box for hook-up by a qualified
electrician. Refer to Chapter 3: Getting Started and
Appendix C: Protector Perchloric Acid Hood
Specifications
for the wiring diagram for proper
electrical installation.

Service Line Requirements

All service lines to the laboratory fume hood should be
¼ inch outside diameter, copper (brass for natural gas),
and equipped with an easily accessible shut-off valve,
should disconnection be required. If the service line
pressure exceeds 40 PSI, it must be equipped with a
pressure regulator to reduce the line pressure.

Space Requirements

The dimensions for the different models are shown in
Appendix B: Protector Perchloric Acid Hood
Dimensions
.

Your Next Step

After you have determined that the location you have
selected accommodates the installation and operational
requirements of your fume hood, you are ready to begin
installation. Proceed to Chapter 3: Getting Started.

Advertising