Labconco Pressure Controller User Manual

Page 16

Advertising
background image

Labconco Operating Instructions 5242600, Rev. B 4/27/07, ECO E275

16 of 20

Plumbing:

Always install the polyvinyl tubing to the solenoid valves on the pressure
controller before placing at the benchtop location. Refer to Detail C for valve
inlet and outlet order.

Glove Box Installation

1. The Pressure Controller has been pre-plumbed for installation in the Glove Box

configuration.

2. Route the tubing to the Glove Box and Transfer Chamber as shown in Detail C. Note:

Tube routing maybe dependent upon your application. Always insure that the
tubing is routed to the correct solenoid valve on the Pressure Controller as
stated on the back of the unit.

3. See Detail D for proper tube installation to the valves on the Glove Box and Transfer

Chamber.

Advertising