Sensor integration – Labconco Pressure Controller User Manual

Page 17

Advertising
background image

Labconco Operating Instructions 5242600, Rev. B 4/27/07, ECO E275

17 of 20

Benchtop Installation: With the Pressure Controller temporary located at the benchtop location
proceed as follows.

1. Measure the distance between the solenoid valves of the Pressure Controller and the

valves on the glove box. Cut the 3/16 ID tubing (the larger of the tubing in your kit)
to the measured lengths.

2. The solenoid valves are embossed with IN or OUT port on the body of the valve, to

indicate the direction of flow. Install the cut lengths of the tubing to the correct port
of the solenoid valve as shown in Detail C.

3. Secure the tubes to the underside of the mounting bracket using the “C” clips

provided and place at the approximate locations shown in Detail C.

4. Route the tubing to the Glove Box and Transfer Chamber as shown in Detail C. Note:

Tube routing maybe dependent upon your application. Always insure that the
tubing is routed to the correct solenoid valve on the Pressure Controller as
stated on the back of the unit.

5. See Detail D for proper tube installation to the valves on the Glove Box and Transfer

Chamber.

Sensor Integration:

The Pressure Controller must be integrated to the glove box. This connection
allows your Pressure Controller to monitor the condition of the glove box
chamber and transfer chamber.

Installation

1. Your kit comes with extra length of polyvinyl tubing so you can integrate the

Pressure Controller with the glove box. This integration requires you to splice into the
existing tubing of your Glove Box, install a bulkhead fitting and new tubing.

TUBE INSERT

TUBE FERRULE

BACK FERRULE

NUT

TUBING