Figure a, Figure c – Sanuvox R+ User Manual

Page 2

Advertising
background image

SAFETY CONSIDERATIONS

Installation and servicing of air-conditioning equipment can be hazardous due to system pressure and electrical components. Only trained and

qualified service personnel should install, repair, or service air conditioning equipment. Untrained personnel can perform basic maintenance

functions such as changing lamps. Trained service personnel should perform all other operations. When working on air conditioning equipment,

observe precautions in the literature, tags and labels attached to the unit or accessory, and other safety precautions that may apply. Follow all

safety codes. Wear safety glasses and work gloves.

INSTALLATION

Location The preferred location for installation of the Sanuvox R+ UV System is in the return duct as the air will be treated before the filter and

HVAC coil. If it is not possible to install in the return duct, it may be installed in the supply duct. Make sure site can be supplied with the

necessary power requirements. Direct UV exposure is dangerous to plastics. Wrap exposed plastic and wiring to shield from direct UV exposure

(The Sanuvox wire-set is Teflon coated which makes them resistant to UV exposure). The purifier can be mounted in a horizontal or vertical

position. More than one unit can be used in homes equipped with more than one air handler.

Preparing the Sanuvox R+ for Installation (FIGURE A.)

NOTE: Remove contents from packaging. Only after you visually inspect the UV Lamp should you break the Security Seal on the

underside of the cardboard sleeve.

1.

Carefully slide the UV Lamp out from the protective sleeve. Be sure to wear the cotton gloves (included) guaranteeing a clean Lamp

free from fingerprints.

2.

Slide the UV Lamp porcelain end-cap (the end with the 4 pins) through the clamp bracket. Insure that the Tension Lever is facing

downward.

3.

Once the Lamp end-cap is in place, move the Tension Lever UP to lock the Lamp in place. If the Lever is loose, turn the Lever

clockwise a turn or so to tighten.

4.

While holding the side of the Lamp attached to the clamp (the end with the four pins), carefully push the white connector onto the four

pins. NOTE: Although the Lamp is fairly strong, too much tension from the opposite side may break the Lamp.

5.

Once the Lamp is installed, place the Turbulator on the top of the Reflecting Tube securing it with the two screws. The two screws are

already screwed to the Reflecting Box when shipped from the factory. The air must pass through this Turbulator as it enters the

Reflecting Tube.

Preparing the Duct (return or Supply) for Installation (FIGURE B.)

NOTE: Evaluate the ideal area for locating and installing the purifier. Ensure that the purifier will fit into the plenum. The space required

inside the plenum is approximately 9" deep x 6" wide x 12" high.

1.

Use the included metal frame to trace the outline onto the duct (allow for a 1/4” space around the marking as to allow the frame to sit

properly in the duct . This will be the guide to cut the duct opening. The duct opening is 12.25" x 6.25".

Mounting the Sanuvox R+ to the Ductwork (FIGURE C.)

The metal frame is what supports the purifier to the duct. The metal frame will fit into the 12.25" x 6.25" opening. Use the six (6) sheet

metal screws to mount the frame to the duct. There are a total of 10 holes on the frame. The top 3 and bottom 3 holes are used to

secure the frame to the duct wall. The two holes on either side of the frame are to be used for the ductboard mounting kit. NOTE: The

orientation of the frame should be as to allow for the “Align Pins” to be positioned in the upper portion of the frame

(Figure3).

1

.

Place the Sanuvox R+ into the frame, guided by the 'align pins'.

2.

Secure the Sanuvox R+ to the frame with the four (4) retaining screws (two on the top, two on the bottom) NOTE: The Reflecting Tube

which houses the UV Lamp may be rotated 360 degrees (in 90 degree increments) allowing for the control box to be vertical in almost

any situation, but allowing the Turbulator, Reflecting Tube and Lamp to face the air-flow. (I.E. horizontal air-flow or up-flow air-flow). To

rotate the Reflecting Tube and UV Lamp, the front cover must be removed. The two Philips screws in the center of the housing (just

above the hex nut) must be removed. This will allow for the Reflecting Tube and UV Lamp to be easily rotated. Re-fasten screws once

the desired orientation is found. Replace cover.

.

Sanuvox R+

UV Lamp

Frame

INCLUDED IN THE BOX: Installation Kit #1 Ductboard Mounting Kit #2

1-888-SANUVOX www.sanuvox.com

FIGURE A.

Turbulator

- Gloves
- 6 x Sheet Metal Screws (#8)
(1/2" long)
- Turbulator

- 2 x “L” Bracket Supports
- 4 x Sheet Metal Screws (#8) (2" long)
- 2 x “Tree” Buttons
- Instructions

2 x “Tree” Buttons

2 x “L” Bracket Supports

GENERAL

The Sanuvox R+ Ultraviolet Air Purification System is designed to destroy bio-chemical contaminants such as mold, bacteria, viruses, chemicals, VOCs

and odors that may be transmitted through the HVAC (heating ventilation, and air conditioning) system.

The Sanuvox R+ may be installed in the return or supply plenum.

1

2

3

4

5

FIGURE B.

12.25”

6.25”

1

1

FIGURE C.

Align Pins

1

2

Please Note: For DUCTBOARD installation, please refer to instructions included in Ductboard Mounting Kit #2

Note: The Align Pins are positioned

at the top of the Frame when the

Frame is installed to the duct.

Holes only to be

used with

ductboard

mounting kit

Holes to be used to

mount the R+ to the

duct wall with included

sheet metal screws

Holes to be used to

mount the R+ to the

duct wall with included

sheet metal screws

The two Turbulator screws
are factory mounted to the

Reflecting Tube

Advertising