TracRac IM T-Rac Pro Toolbox Mount User Manual

Page 5

Advertising
background image

T-Rac ToolBox Mount Kit

INSTRUCTION MANUAL

5

TracRac Inc. 994 Jefferson Street, Fall River, MA 02721-4893 • 508-677-4130

6. Place the toolbox back onto the mounting clamps. Mark the side of the toolbox where each clamp center is located (re-

member to position the box so the top can open). Take the box off, flip it upside-down and transfer the marks to the “D”
dimension centerlines. Drill 7/16” holes for each clamp location (See Figure 6).

Figure 6. Hole Location Marking

D

Dimension

Transfer marks to intersect
with the “D” dimension.
Drill 7/16” holes (both sides)

Transfer marks to intersect
with the “D” dimension.
Drill 7/16” holes (both sides)

Avoid interference

Advertising