Mixed array – d&b Vi User Manual

Page 25

Advertising
background image

5. At the rear, align the Rear link with the hole of the SUB

cabinet's Splay link.

6. Reinsert the Locking pin
7. Reinsert the fixing bolt.
8. Insert and lock the ring cotter.

5. Check the assembly
Before hoisting the array to its operating position, recheck the

actual status of the entire assembly according to the checklist given

in Þ Chapter 4. "Safety and system checks" on page 32.

3.4. Mixed array

NOTICE!

If SUB cabinets are included in the array, these must always be

positioned at the top of the column.

Remarks and limitations
For a mixed setup, two frames are required. One frame is used for

suspension and the second frame acts as an adapter to add Vi8/

Vi12 cabinets below the Vi-SUB cabinets.

NOTICE!

In mixed arrays, the Z5380 V Flying frame must always be used as

a suspension device.
For the second frame, there are two options depending on the

number of TOP cabinets to be mounted:

Up to 4 x Vi-TOP cabinets can be mounted underneath the

SUB cabinets using the Z5387.001 Vi Mounting frame bottom

in addition to the V Flying frame.

If the array includes more than 4 x Vi-TOP cabinets, an

additional Z5380 V Flying frame must be used instead of the

Vi Mounting frame bottom.

In this case, please follow the assembly instructions given in

the V-Series Rigging manual which is supplied with the V Flying

frame. In the manual refer to "Flown array", section "Mixed

array".

As a first step to building this type of setup, the Z5380 V Flying

frame must be attached at the top of the array. This is done in the

following way:

d&b Vi Rigging manual (1.2 EN)

25

Advertising
This manual is related to the following products: