Ead2 - electric advance & drop v2 – Future Automation EAD2 User Manual

Page 9

Advertising
background image

In

st

all

at

io

n

: S

ta

ge

4

Page 8 of 18 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565

EAD2 - Electric Advance & Drop V2

Cable routing

Bring the cables through the wall and the EAD2 wall plate. Loop around the
hinge tube allowing enough slack not to get caught or pulled taught.
Run the cables inside the arm and cable tie to the management brackets.
Bring the cable out though the exit hole and down to the screen.
Make sure there is enough slack from the screen to the mechanism to allow
for movement.

Section view

Wall Plate

Cable Management Brackets

Cable Exit Hole

Cable Route

Slack Required

Slack Required

Hinge Tube

Advancing Arm

Advertising