Zaura system installation and configuration, Installation summary – Zilog ZAURCT User Manual

Page 15

Advertising
background image

UM022903-0311

ZAURA System Installation and Configuration

ZAURA

RF Wireless Lighting Control

Installation Guide

9

ZAURA System Installation and
Configuration

This chapter describes room requirements assessment, battery installation, starter installa-
tion and association, and how to configure and mount your ZAURA masters and range
extenders. The chapter begins with an Installation Summary section, which provides a
blueprint suitable for installers who have previously performed a ZAURA installation.

Installation Summary

The steps in this section summarize the sequence of a typical ZAURA System installation.
Links to additional sections of this document have been added to provide more detailed
assistance.

1. Determine the location of Standard Masters (and Range Extenders, if required). For

additional assistance with this step, see the the

Determine Master and Range Extender

Locations

section on page 11.

2. Determine luminary configuration. For additional assistance with this step, see the the

Determine Luminary Configuration

section on page 13. Items to consider when

configuring your luminaries are:

Which luminaries, if any, will be using their original starters (consider safety con-
cerns)

Which luminaries will contain ZAURA Starters

Which luminaries will contain ZAURA Virtual Dimming Starters (typically for
placement near windows)

3. Inventory your parts (Masters/Range Extenders, Starters, etc.) and tools to ensure that

you have sufficient quantities for the required installation. For additional assistance
with this step, see the the

Inventory Parts and Tools

section on page 15.

4. Mount base plate(s) to the ceiling in the location(s) you determined in Step 1 using the

screws or the double-sided tape provided.

1

. For additional assistance with this step,

see the the

Mount Base Plates

section on page 15.

5. Configure the ZAURA Masters. For additional assistance with this step, see the the

Configuring ZAURA Masters

section on page 18.

1. Zilog recommends using the screws provided with the ZAURA System when mounting the Master base plate;

however, double-sided tape is provided with the installation hardware. Simply press the double-sided tape to the
base plate, then mount the base plate securely to the mounting surface to ensure good adherence. Depending on the
mounting surface, however, caution should be used when removing the base plate when it has been affixed with the
double-sided tape, because damage to the Master housing and/or to the mounting surface could occur.

Advertising
This manual is related to the following products: