Installation overview, Testing, Finishing – Amina AIW750i User Manual

Page 8

Advertising
background image

Installation overview

Section

Section

Preparing the wall / ceiling

and fixing the product

Alignment and plastering preparation

in retrofit applications

Cavity

installation with fixing

blocks

Typically a new build

or full refurbishment

Start at page 05

Patch plastered

For walls/ceilings

that have already

been plastered

Page 13

Feathered skim

For walls/ceilings

that have already

been plastered

Page 14

Full wet skim

For walls/ceilings

that have already been

plaster finished

Page 15

Drywall

patch plastered

For new drywall

walls/ceilings that

will be taped

and jointed

Page 16

Drywall

feathered skim

For new drywall

walls/ceilings that

will be taped

and jointed

Page 17

Solid structure

installation

with backbox

New builds or full refurbs

Start at page 10

Cavity installation

with backbox

For new builds or full refurbishment

where sound transmission

needs to be reduced

Start at page 08

A

B

Section

Testing

page 18

C

Section

Finishing

page 19

D

04

A1

B1

B4

A2

B2

B5

A3

B3

Advertising
This manual is related to the following products: