Hardware Preparation and Installation

ATCA-7350 Installation and Use (6806800G59G)

51

2.7

Installing and Removing the Blade

2.7.1

Installation

RTM-ATCA-7x50 must be installed before the ATCA-7350 to avoid product damage. For more
information on RTM-ATCA-7x50, refer to RTM-ATCA-7150 Installation and Use manual and RTM-
ATCA-7350 Installation and Use
manual.

2.7.1.1

Installing the ATCA-7350 in a Powered Shelf

The following procedure describes the installation of the blade. It assumes that your system is
powered. If your system is unpowered, you can disregard the blue LED and thus skip the
respective step. In this case it is a purely mechanical installation.

1. Wear the ESD-preventive wrist strap.

For details, see

Wearing the ESD-Preventive Wrist Strap

on page 34

2. Take the ATCA-7350 out of the antistatic package.

3. Fully open the upper and lower ejector handles.

4. Slide the ATCA-7350 along the guide rails until the positioning pins of the ATCA-7350 are

inserted in the positioning holes in the shelf, as shown in

Figure 2-8

.

5. Make sure that the upper and lower ejector handles are attached to the beam properly.

Close the upper and lower ejector handles until the inner sides of the ejector handles are
attached to the face plate, as shown in

Figure 2-8

. After closing the handles, the blue LED,

OOS and IS LEDs blink. When payload is powered on, the blue LED is continuously
illuminated, and the OOS and IS LEDs are out.

6. User the screwdriver to clockwise fasten the screws to fix the ATCA-7350, as shown in

Figure 2-8

.