Bronkhorst Mini CORI-FLOW Quick Start User Manual

Page 4

Advertising
background image

9.17.052

4

4e. Mounting position (integrated) valve with purge connector

Only for mini CORI-FLOW™ instruments with (integrated) liquid valve with purge adaptor, mounting position

can be critical for a good quality of de-gassing.

i

www

Please consult the Instruction Manual for additional information on mounting the mini CORI-FLOW instruments.

This document can be found in the download section of our website: www.bronkhorst-cori-tech.com/en/

downloads/instruction_manuals/

Liquid purging

In order to remove gas bubbles during start-up, flushing with relatively high flow rate of liquid for some minutes is

recommended.

Gas purging

In order to remove condensation drops during start-up, flushing with dry gas for some minutes with high flow rate

is recommended.

Leak tightness

Verification of leaks is required prior starting up of the process.

5. Leak check

Check the system for leaks before applying (fluid) pressure. Especially if toxic, explosive or other dangerous fluids

are used!

Gas tight is not the same as liquid tight

Please note that connections which are tight for liquid, could still be untight for gas. This can result in Air enclosure

in the liquid, e.g. when using pumps, which might lead to errors in measurement.

6. Electrical connection

Electrical connections must be made with a standard cable or according to

the mini CORI-FLOW™ hook-up diagram.

mini CORI-FLOW™ instruments have a IP65 ingress protection rating.

Optional mini CORI-FLOW™ instruments can be ATEX Zone 2 protected. For ATEX Zone 2 applications, all (optional)

connectors and the impact protection cover must be mounted on the instrument.

7a. Analog/Local operation

Connect the mini CORI-FLOW™

to the power supply/readout

unit with the 8-pin cable at

the circular connector.

Example 1

Example 2

Advertising