Installation – Caple AUF900 User Manual

Page 3

Advertising
background image

2

Installation

1. The ceiling must bear at least 120kgs weight, and the thickness of the ceiling
must be 30MM, see pic 1, drill 1*170mm round hole in the ceiling.
2. According to the hanging board, drill 12 holes in the ceiling, see pic 1, 12pcs
of ST6*40mm big flat screws will be used to fix the hanging board on the ceiling,
and then 8pcs of M4*10 screws and M4 nut with gasket will be used to connect
the angle iron into the hanging board, see pic 1, calculated the length of the
angle iron, and 16pcs M4*10 big flat screws and M4 nut with gasket will be used
to connect the angle iron and another angle iron ( the overlap length of angle
iron cannot be less than 100MM.)
3. Let the one side of the extensible pipe go outside through the hole of 170MM,
see pic 2.
4. 4pcs ST4*8 big flat screws will be used to connect the internal chimney into
the hanging board, then put one the external chimney, one hook will be used to
put up the external chimney in order to the next installation, see pic 3.
5. 4pcs ST4*8 big flat screws will be used to install the outlet, see pic 4 (if the air
suction of the motor is 1000m3/h, pls skip this step)
6. Hold up the hood, 16pcs M4*10 big flat screws will be used to connect the
hood body into angle iron, see pic 5.
7. Put the extensible pipe on the outlet; after ensuring all the fixings are ok, put
down the hook, take from the external chimney, all the installation is finished, see
pic 7.

Advertising
This manual is related to the following products: