Installing the ductwork, Fixing to the wall – Caple AS610BK User Manual

Page 5

Advertising
background image

Installing the Ductwork

1. Plan where the ductwork will run between the hood and the outside. The

hoods exhaust vertically but can be ducted to the rear behind the chimney

duct through an outside wall or vertically up through the ceiling to the

roof. A short straight duct run will produce the most air flow. Length and

elbows will reduce the efficiency of the blower.

2. Install a roof or wall cap. Connect a 6 round metal duct to the cap and

work backwards toward the hood. Ensure joints are completely sealed

with duct tape.

Fixing to the Wall

1. Before mounting the hood, plug in and test all functions for correct operation.

2. Remove the filters from the bottom of the hood to pre vent damage during the installation.

3. With assistance, hold the hood temporary in position ensuring the bottom is above the minimum clearance for

the cooking surface. Mark on the wall the holes for the two mounting screws.

4. Drill the holes and install the mounting bracket (1) . Use the appropriate screws and screw anchors for your

wall type (e.g. reinforced concrete, drywall, etc.). If necessary, prepare back wall with cross framing for secure

installation.

5. Mount the hood onto the bracket (2).

Connect a 6 aluminum duct tube (not included) to the exhaust piece using duct tape on all seals. (C)

7.

to roof cap

to wall cap

hood

decorative
chimney duct

38

39

40

Mounting bracket

Hook

1

2

mushroom tapping screw

3

6. Install two

mushroom tapping screw into the wall.

Advertising
This manual is related to the following products: