Waveguide switch installation, 5 waveguide switch installation – Comtech EF Data KST-12025 User Manual

Page 73

Advertising
background image

KST-12025 Ku-Band Satellite Terminal

Redundant System Installation

Rev. 1

3–19

4. Using four 6-32 x 7/8” socket head cap screws, eight #6 flat washers, four #6

split lockwashers, and four 6-32 nuts, attach the LNA to the antenna waveguide.
Tighten the cap screws firmly.

3.3.5

Waveguide Switch Installation

The following process is for a typical installation. Custom systems may be ordered, and
are beyond the scope of this manual.

An installed waveguide switch is shown in Figure 3-2. Refer to Section 3.2.1 for
included parts.

Figure 3-2. Installed Waveguide Switch

Advertising