4. Using four 6-32 x 7/8” socket head cap screws, eight #6 flat washers, four #6
split lockwashers, and four 6-32 nuts, attach the LNA to the antenna waveguide.
Tighten the cap screws firmly.
3.3.5
Waveguide Switch Installation
The following process is for a typical installation. Custom systems may be ordered, and
are beyond the scope of this manual.
An installed waveguide switch is shown in Figure 3-2. Refer to Section 3.2.1 for
included parts.