Lever-nut version – Digi-Star SW3300 User Manual

Page 17

Advertising
background image

Installation & Operation

D3746 17

J-BOX INSTALLATION

[Lever-Nut Version]

IMPORTANT:

Do Not weld to load cells with load cell cables

connected to the indicator. If you must weld with load cells

connected, locate welder ground so that current will not flow

through the load cell.

Decal – Lever Nut Wiring Instructions

Tighten nuts

Load cell cable

See Decal Above For

Wiring Instructions

J-Box Power Cable

Connect to Indicator

bottom panel.

Advertising
This manual is related to the following products: