DNF Controls UABS-I Installation_Manual User Manual

Page 19

Advertising
background image

Flex Control Network

®

UABS-I Installation Manual

1

1

8

8

of 18

7. CP20 INSTALLATION

CAUTION
Do NOT apply AC voltage to the power supply, before connecting the power

supply to CP20 CONTROL PANEL. Component damage may occur.

1) Connect a Cat 5 cable to CP20 CONTROL PANEL connector labeled “E-

NET #1”. Connect other end of the Cat 5 cable to customer supplied
Ethernet hub.

2) Connect power supply DB9 female connector to the CP20 CONTROL

PANEL connector labeled “POWER“.

3) Connect female side of AC power cable to the supplied power supply.
4) Connect male side of AC power cable to 100 – 240VAC.
5) Push the CONTROL PANEL power switch, located on rear panel, to ON

position. “O” on the power switch is the OFF position.

6) When power up and system initialization completes, the front panel

display will show Model Number and Software Version. Allow 25
seconds for power up and system initialization to complete.

CAUTION
Do NOT apply AC voltage to power supply, then hot plug the power supply to
the CP20 CONTROL PANEL. Component damage may occur.


Advertising