Flowserve ISC2 Series User Manual

Page 9

Advertising
background image

flowserve.com

9

5. Equipment Check

5.1 Follow plant safety regulations prior to equipment disassembly:

• lock out motor and valves.
• wear designated personal safety equipment.
• relieve any pressure in the system.
• consult plant MSDS files for hazardous material regulations.

5.2 Disassemble pump in accordance with equipment manufac-

turer’s instructions and remove sealing arrangement.

5.3 Check seal documentation for seal design and materials of

construction. Verify that the ISC2 seal is designed for the
equipment being repaired.

5. Check seal assembly drawing for any modifications required

to the equipment before installation and act accordingly.

5.5 Check shaft or pump sleeve OD, seal chamber depth, seal

chamber bore, distance to the fi rst obstruction, gland pilot
and gland bolting
to ensure they are dimensionally within the
tolerances shown on the seal assembly drawing.

5.6 Thoroughly inspect and clean the seal chamber and shaft or

pump sleeve. Inspect for corrosion or any defects. Remove
all burrs, cuts, dents or defects that might damage gaskets
or allow a leak path. Replace worn shaft or pump sleeve.
Remove sharp edges from keyways and threads.

5.7 Check equipment requirements as described in Figure 1. Any

reading greater than what is allowed must be brought within
specifications.